Saturday, 18 June 2011

New frames for the stud walls go in

This will be the master ensuite.
 ...from the other side...
 and from the master bedroom again.
 New wardrobe in bedroom 4
 Handy eaves storage
 Extra insulation in the roof to meet new building regs
 Bedroom 4 (new wall to the left)

 New joist - to make room for new corridor to bedrooms 3 and 4 and to allow an entrance from bedroom 3 into the ensuite.

No comments:

Post a Comment