Sunday, 26 June 2011

First fit electrics and latest pics

Wiring for the new bathroom lighting
 A light switch
 Bedroom 3 and ensuite, with some wirings!
 Inside the ensuite
 New light switches
Ceiling boarded in the attic (bedroom 5) 
 Covering up some hefty insulation

The jungle - volunteers needed...

Anyone want to help us clear the garden? You can keep the graffiti as a souvenir!

Our first adventure into the garden!




 A BBQ!

Saturday, 18 June 2011

New frames for the stud walls go in

This will be the master ensuite.
 ...from the other side...
 and from the master bedroom again.
 New wardrobe in bedroom 4
 Handy eaves storage
 Extra insulation in the roof to meet new building regs
 Bedroom 4 (new wall to the left)

 New joist - to make room for new corridor to bedrooms 3 and 4 and to allow an entrance from bedroom 3 into the ensuite.

Sunday, 12 June 2011

First new walls

Ok, so these are just replacing doors, but progress!


Stairs

We have new stairs to the attic floor... and the ground floor stairways have been opened up!

Looking good!



Lounge wall has gone

We now, almost have a through room... and an opening for a fire place.

But, can a 150 year old piece of wood support three storeys?  Apparently so.




We've started a trend!

The entire road of houses now has scaffolding up - all smartening themselves up...